Ukrainian certificate of conformity 2
New generation wireless mesh networks 1. Characteristics of data networks. Data transmission networks over the air, must meet the conflicting requirements depending on the application. To address specific problems you need to determine: the structure of the data transmission network, a way to access the channel data transmission, frequency range, data rate, battery life, the… Read more »
With implementation of automated control and metering systems AMR/AMI of energy consumption, the optimal solution is the deployment of a stationary system “BALANCE”. System “BALANCE” includes tools of automatic data collection from the primary metering equipment and data transmission to data processing system for archiving and future reference. For energy sales organizations are very important,… Read more »
Simple and reliable operation Automatic operation D-Mesh system used automate daily reads with hourly data and data export to billing systems. The self-configuring and self-healing function D-Mesh network allows automatic maintenance of wireless network and reliable data transmission even in changing radio environment conditions
In Belarus Council of Ministers Decree №141 dated February 27, which will come into force on March 1, indexed government subsidized gas prices, tariffs for electricity and heat for heating and hot water.
In connection with the transition to winter time on October 26, citizens will have to reprogram their two-zone (day-night) or three-zone (night-half-peakto-peak) electricity meters. It each family will have to spend up to 700 rubles.
The power distribution industry is fast moving towards adoption of smart grid technology. It is seen as a major step towards better monitoring of electricity networks including metering infrastructure.
Brussels, Belgium — (METERING.COM) — December 19, 2011 A minimum common set of functionalities for smart metering has been put forward by the European Commission with the aim of enabling member states to identify common means of achieving cost efficiencies (and inefficiencies) in their rollout plans.